(On-Demand) Empowering Interpreters on the Job: The demand control schema at work
CEUS: CEAP: 2.0 [#10580], IMIA/NBCMI; 2.0 [24-1238], RID: 0.2 This training will allow interpreters the ability to analyze their work through this occupational health model, thereby encouraging boundaries and work balance.